11
1.
SIMPLE AND PRECISE INSTALLATION AND FIXING
Easy and simple assembly with precise fastening ensures
correct position throughout the installation process.
FIXING DURING CASTING
The drain unit is attached to the wall with screws throughout
the casting process and is therefore not displaced. After
casting, the unit must be fully supported by the concrete layer.
EASY TO PERFORM LEVELLING WITH ONE-SIDED SLOPE
A one-sided slope makes it easy to ensure correct levelling
without the risk of backflows and depressions. The base
for the tiled surface can be laid on a completely even and
level surface.
WETROOM PROTECTION OF WALLS AND FLOOR
The membrane’s overlap with the drain unit’s
floor and wall flanges forms a sealed, wetroom-protected
connection to both floor and wall.
IT IS EASY TO LAY TILES ON A COMPLETELY LEVEL SURFACE
The one-sided slope makes tile-laying even easier
- even with very large tiles. There is no need to cut the tiles
to fit around the drain.tilskæring af fliserne omkring afløbet.
PROTECTIVE FILM ON ALL LINE DRAINS FROM 1 JUNE 2021
This is the end of concrete debris, mortar and til shards in the drain. We have developed a new film that protects every
aspect of the installation process. After the plumber has inserted the water trap and attached the drain to the wall, he
seals it with the film. Then the drain is ready for the builder to take over and cast the floor. Prior to applying the wet room
membrane, the builder removes the part of the film where the wet room membrane will be applied. Finally, just before
laying the tiles, the last part of the film is removed.
THE FIRST FIVE INSTALLATION STEPS
ARE ILLUSTRATED ON THE FILM
1. Position the outlet unit
2. Check that the gasket is placed correctly
3. Mount the water trap
4. Remove back of the film
5. Seal the film over the drain
2.
3.
4.
5.
L
I
N
E