Installation
The CD-4 ceiling system is installed on a double metal frame-
work for constructing plasterboard drop ceilings, the only re-
quirement being that the second framework must be spaced
40 cm.
The panels are fitted with hooks that make fixing to the sus-
pended ceiling structure possible.
We recommend not screwing the pro
files of the second frame-
work to the perimeter profile, in order to be able to move them
easily, thereby facilitating fixing the panels.
All hydraulic connections are formed using push-fit quick cou-
plings.
The infill panels are
fixed later, directly to the metal profiles that
make up the second framework.