Installation - cladding

The CD-4 panels are completely separate from the cladding

panels. This means that the edge joints and gaps must be made

as prescribed by the panel suppliers.

HOWEVER, we recommend using micro-perforated paper, and

not adhesive meshed tape, for covering the edge to edge dis-

tance between the panels.

First framework i = 800 mm

Perimeter channel

sections

Second framework i = 400 mm

DO NOT FIX THE SECONDARY FRAMEWORK TO THE PERIMETER SECTION

Perimeter wall

CD-4 panel

Cladding sheet

Second framework i = 400 mm

Cladding sheet

CD-4 panel

20

Ceiling and wall radiant system – Product guide

Tel. +39 0425 75 88 11